Welcome to the Info TEST server!

Skip to content. | Skip to navigation

Sections
Retirees > Galleries > Other Sites Gallery > New Surface for Tucson's 36 Foot, May 1982

New Surface for Tucson's 36 Foot, May 1982

In May 1982, in the Green Bank Warehouse where the work was done, John Payne (left) and John Findlay contemplate engineering issues during the fabrication process for the new surface and back-up structure that would convert Tucson's 36 foot telescope into a 12 meter telescope. The 36 foot closed for resurfacing and upgrade on 15 July 1982, and first observations with the 12 meter were made on 17 January 1984. (GB-82-20137_clean_payne-findlay-12m-fab.jpg)
New Surface for Tucson's 36 Foot, May 1982
Full-size image: 86 KB | View image View Download image Download
Contact & Visit

Sarah Arnold
Sarah Arnold
(434) 296-0312
M-F 9:00am - 5:00pm EST

VIA logo
VIA Benefits
1-855-873-0098
(TTY: 711)
M-F 8:00am - 9:00pm EST


Health Advocate
Health Advocate
1-866-695-8622
M-F 8:00am - 7:00pm EST


Public Visits


Conference/Private Visits
Conference attendees & private visitors: please complete the form below.